• <button id="66kmq"><dl id="66kmq"></dl></button>
    <table id="66kmq"></table>
  • <li id="66kmq"></li>
  • <code id="66kmq"></code>
  • <code id="66kmq"></code>
    歡迎來Nano電子商城!
    您好 [請登錄]   [免費注冊]
    x
    全部商品分類

    Bonderite_L_GP_333_Black_PTFE_Coating產品資料

    下載次數:143 瀏覽次數:458發布時間:2017-11-11 20:29
    允許查看的會員等級:非會員   普通會員   高級會員   VIP會員   

    文檔詳情

    Surface Preparation

    Substrates must be dry and free of contaminants (dirt, grease, powder, and other

    residues)before application of Emralon 333. Excellent results can be obtained without pretreatment.However,

    for maximum wear characteristics the following pre-treatment’s are

    recommended:heat stable phosphate coating* or grit blasting for steel; grit blasting or heat

    stable conversioncoating for aluminum.

    Mixing

    Emralon 333 is supplied ready for use, but it should be mixed thoroughly by stirring. For

    bestresults, use a low speed propeller-type mixer. Do not vortex or agitate violently, as

    airentrapment or foaming may cause separation of solids.

    Application

    Emralon 333 is normally applied by spray techniques. An external atomizing type gun

    usingan MBC #30 nozzle is recommended. Optimum coating thickness is 0.001 inch

    (25.4microns). USE ONLY SB-3 SOLVENT FOR CLEAN-UP. Incompatible solvents will

    cause gunblockage. Emralon 333can be overcoated for repair purposes without removing

    the entireoriginal film. Sand lightly or use steel wool to feather the edges of the area to be

    repaired.Light abrasion of the surrounding areas is also recommended for maximum

    adhesion. Thenapply Emralon 333, using the same spray procedures as for the initial

    application. Follow thestandard cure cycle as stated below.

    Curing

    Emralon 333 may be cured by exposure to any of the time/temperature conditions

    indicated inthe following table. It is essential that the high boiling solvents in Emralon

    333be removedgradually before the cure is completed or the coating will be marred by

    blisters. Gradualremoval of the solvent can be accomplished by preheating the coating for

    ten minutes at149°C (300°F) or 177°C (350°F) before curing.

    For example, typical cure cycles are:

    SUBSTRATE TEMP/TIME SUBSTRATE TEMP/TIME

    (a) 149°C (300°F) 10 min.

    (b) 149°C (300°F) 10 min.

    (c) 149°C (300°F) 10 min.

    (d) 177°C (350°F) 10 min.

    (e) 177°C (350°F) 10 min.

    260°C (500°F)/ 15 min.

    288°C (550°F)/ 9 min.

    316°C (600°F)/ 5 min.

    371°C (700°F)/ 1 min.

    399°C (750°F)/ ? min. 

    我們營業的時間9:00-18:00

    • 技術
    關閉在線客服

    Nano電子商城微信公眾號手機商城 Nano電子商城微信公眾號二維碼

    手機商城           微信商城

    任何購物問題請聯系納米科技(香港)有限公司  | 江蘇省蘇州市昆山開發區章基路189號科創基地2號樓202室 Tel:021-52069907 email: 19mro@19mro.com

    工作時間:周一至周五 8:00-18:00; 網站備案號 :滬ICP備12049383號; Copyright?2009-2012 19mro.com 版權所有 


     
    国产在线拍偷自揄拍无码| 精品久久久无码中文字幕| 亚洲国产精品狼友中文久久久| 亚洲AV无码专区亚洲AV伊甸园 | 色综合久久无码中文字幕| 亚洲av日韩av高潮潮喷无码| 日韩中文久久| 天堂√最新版中文在线天堂| 少妇无码太爽了不卡视频在线看 | 亚洲AV成人无码久久精品老人| 欧美激情中文字幕| 亚洲人成无码www久久久| 免费无码VA一区二区三区| 亚洲gv猛男gv无码男同短文 | 日韩乱码人妻无码中文视频| 亚洲AV无码一区二区一二区 | 国产午夜无码片免费| 精品无码一区二区三区亚洲桃色| 久久亚洲精品无码VA大香大香| 精品久久久久久中文字幕大豆网 | 无码精品久久一区二区三区| 无码av最新无码av专区| 亚洲一区二区三区AV无码| xx中文字幕乱偷avxx| 暖暖免费在线中文日本| 国产在线精品一区二区中文| 在线观看无码AV网站永久免费 | 中文字幕无码无码专区| 亚洲?V无码成人精品区日韩| 在线看无码的免费网站| 精品久久久久久无码专区| 久久久久亚洲AV无码网站| 日韩精品专区AV无码| 国产精品亚洲аv无码播放| 蜜桃臀无码内射一区二区三区 | 在线观看无码AV网站永久免费 | 最近中文字幕大全免费视频| 亚洲制服中文字幕第一区| 久久亚洲2019中文字幕| 无码国产精品一区二区免费虚拟VR | 亚洲日韩中文字幕日韩在线|