• <button id="66kmq"><dl id="66kmq"></dl></button>
    <table id="66kmq"></table>
  • <li id="66kmq"></li>
  • <code id="66kmq"></code>
  • <code id="66kmq"></code>
    歡迎來(lái)Nano電子商城!
    您好 [請(qǐng)登錄](méi)   [免費(fèi)注冊(cè)]
    x
    全部商品分類(lèi)

    LMS粉塵氣溶膠發(fā)生器原版使用手冊(cè)

    Weigh out and apply ASHRAE 52.1 dust in the tray and distribute the dust in a thin, evenly-spread la
    下載次數(shù):351 瀏覽次數(shù):617發(fā)布時(shí)間:2018-07-01 17:16
    允許查看的會(huì)員等級(jí):非會(huì)員   普通會(huì)員   高級(jí)會(huì)員   VIP會(huì)員   

    文檔詳情

    - Unpack the dust feeder.

    - Plug in the electrical line to standard 220-240 VAC outlet.

    - Note that the feeder tray slides freely on two nylon rails when the vertical lever pin is disengaged (lifted up) from the feeding chain.

    - Set the tray in position by inserting (push down) vertical lever pin between two links on the feeding chain at approx. 3 inch or more forward of the sprocket that turns the chain.

    - Since the dust will be spread evenly across the width of the tray, and the tray advances ~28 cm (~11”) in 10 minutes, it is necessary to mark on the tray where the dust will be placed; make a mark on one edge of the tray that rides on a nylon bar near the paddle wheel – designate this as the starting point (0) for dust placement. Turn on the tray feed toggle, allow 10 minutes for the tray to advance, then mark the tray again – about 28 cm back from the staring point - designate this as the stopping point (10) for dust placement.

    - Supply an air pressure line (720 Kpa max) to the air inlet fitting (1/4 FPT) located on the side of the unit.   Option: it may be desirable to connect a standard shut-off valve and/or a quick-disconnect fitting(s) at this air inlet for convenience.  

    - Dry-run the unit without dust on tray to check unit operation:  with electricity & 700 Kpa at air inlet, turn on toggle switches first for TRAY FEED, then PADDLE WHEEL, then ASPIRATOR, and ascertain that tray moves slowly, paddle wheel rotates with wheel guard down, and that forced air comes out of the delivery tube.  

    OPERATION

    - Set the line pressure to 600 Kpa (for ASHRAE usage the airflow is 14.5 scfm and pressure should be set accordingly to achieve this flow rate). Refer to section 5.4 in the ASHRAE 52.1 procedures.

    - Connect the air outlet of the delivery tube to your test air duct. 

    - Weigh out and apply ASHRAE 52.1 dust in the tray and distribute the dust in a thin, evenly-spread layer between the two start/stop marks (0 and 10 min.) on the tray.  Depending on the flow rate of the filter under test, the amount of dust needed equates to 2 grams of dust per 1000 cfm of air flow in the duct per minute of dust feed.

    ?

    我們營(yíng)業(yè)的時(shí)間9:00-18:00

    • 技術(shù)
    關(guān)閉在線客服

    Nano電子商城微信公眾號(hào)手機(jī)商城 Nano電子商城微信公眾號(hào)二維碼

    手機(jī)商城           微信商城

    任何購(gòu)物問(wèn)題請(qǐng)聯(lián)系納米科技(香港)有限公司  | 江蘇省蘇州市昆山開(kāi)發(fā)區(qū)章基路189號(hào)科創(chuàng)基地2號(hào)樓202室 Tel:021-52069907 email: 19mro@19mro.com

    工作時(shí)間:周一至周五 8:00-18:00; 網(wǎng)站備案號(hào) :滬ICP備12049383號(hào); Copyright?2009-2012 19mro.com 版權(quán)所有 


     
    最近中文字幕完整版资源| 无码国产精品一区二区免费式芒果| 亚洲乱亚洲乱妇无码麻豆| 久久亚洲精精品中文字幕| 亚洲情XO亚洲色XO无码| 久久婷婷综合中文字幕| 99久久无码一区人妻| 中文字幕一二区| 人妻无码αv中文字幕久久琪琪布| 亚洲AV无码一区二区乱孑伦AS| 久久ZYZ资源站无码中文动漫| 无码日韩人妻AV一区免费l| 久久精品国产亚洲AV无码麻豆| 婷婷五月六月激情综合色中文字幕| 无码av免费网站| 天堂а√中文在线| 国产在线无码一区二区三区视频| 中文精品99久久国产| 西西4444www大胆无码| 色窝窝无码一区二区三区色欲| 中文字幕亚洲综合久久2| 久久久久亚洲AV无码专区网站| 麻豆国产精品无码视频| 亚洲中文字幕无码一区二区三区| 亚洲日韩国产二区无码| 久久中文娱乐网| 佐藤遥希在线播放一二区| 人妻精品久久无码专区精东影业 | 无码人妻久久一区二区三区蜜桃| 亚洲精品~无码抽插| 亚洲第一极品精品无码久久| 99无码熟妇丰满人妻啪啪| 日本中文字幕电影| 亚洲成A人片在线观看无码3D | 中文字幕丰满乱子伦无码专区| 久久精品中文字幕一区| 无码专区国产无套粉嫩白浆内射| 日韩网红少妇无码视频香港| 一本色道久久HEZYO无码| 国产精品99久久久精品无码 | 亚洲视频中文字幕|