• <button id="66kmq"><dl id="66kmq"></dl></button>
    <table id="66kmq"></table>
  • <li id="66kmq"></li>
  • <code id="66kmq"></code>
  • <code id="66kmq"></code>
    歡迎來Nano電子商城!
    您好 [請登錄]   [免費注冊]
    x
    全部商品分類

    LMS粉塵氣溶膠發(fā)生器原版使用手冊

    Weigh out and apply ASHRAE 52.1 dust in the tray and distribute the dust in a thin, evenly-spread la
    下載次數(shù):344 瀏覽次數(shù):597發(fā)布時間:2018-07-01 17:16
    允許查看的會員等級:非會員   普通會員   高級會員   VIP會員   

    文檔詳情

    - Unpack the dust feeder.

    - Plug in the electrical line to standard 220-240 VAC outlet.

    - Note that the feeder tray slides freely on two nylon rails when the vertical lever pin is disengaged (lifted up) from the feeding chain.

    - Set the tray in position by inserting (push down) vertical lever pin between two links on the feeding chain at approx. 3 inch or more forward of the sprocket that turns the chain.

    - Since the dust will be spread evenly across the width of the tray, and the tray advances ~28 cm (~11”) in 10 minutes, it is necessary to mark on the tray where the dust will be placed; make a mark on one edge of the tray that rides on a nylon bar near the paddle wheel – designate this as the starting point (0) for dust placement. Turn on the tray feed toggle, allow 10 minutes for the tray to advance, then mark the tray again – about 28 cm back from the staring point - designate this as the stopping point (10) for dust placement.

    - Supply an air pressure line (720 Kpa max) to the air inlet fitting (1/4 FPT) located on the side of the unit.   Option: it may be desirable to connect a standard shut-off valve and/or a quick-disconnect fitting(s) at this air inlet for convenience.  

    - Dry-run the unit without dust on tray to check unit operation:  with electricity & 700 Kpa at air inlet, turn on toggle switches first for TRAY FEED, then PADDLE WHEEL, then ASPIRATOR, and ascertain that tray moves slowly, paddle wheel rotates with wheel guard down, and that forced air comes out of the delivery tube.  

    OPERATION

    - Set the line pressure to 600 Kpa (for ASHRAE usage the airflow is 14.5 scfm and pressure should be set accordingly to achieve this flow rate). Refer to section 5.4 in the ASHRAE 52.1 procedures.

    - Connect the air outlet of the delivery tube to your test air duct. 

    - Weigh out and apply ASHRAE 52.1 dust in the tray and distribute the dust in a thin, evenly-spread layer between the two start/stop marks (0 and 10 min.) on the tray.  Depending on the flow rate of the filter under test, the amount of dust needed equates to 2 grams of dust per 1000 cfm of air flow in the duct per minute of dust feed.

    ?

    我們營業(yè)的時間9:00-18:00

    • 技術(shù)
    關(guān)閉在線客服

    Nano電子商城微信公眾號手機(jī)商城 Nano電子商城微信公眾號二維碼

    手機(jī)商城           微信商城

    任何購物問題請聯(lián)系納米科技(香港)有限公司  | 江蘇省蘇州市昆山開發(fā)區(qū)章基路189號科創(chuàng)基地2號樓202室 Tel:021-52069907 email: 19mro@19mro.com

    工作時間:周一至周五 8:00-18:00; 網(wǎng)站備案號 :滬ICP備12049383號; Copyright?2009-2012 19mro.com 版權(quán)所有 


     
    中文字幕精品无码久久久久久3D日动漫 | 亚洲中文字幕无码久久精品1| 精品无码专区亚洲| 国产AV无码专区亚洲AWWW| 天堂新版8中文在线8| 久久中文字幕无码专区| 无码人妻丰满熟妇区免费| 亚洲AV无码无限在线观看不卡| 漂亮人妻被中出中文字幕久久| 亚洲精品无码99在线观看| 亚洲A∨无码一区二区三区| 最近中文字幕免费mv在线视频| 亚洲人成无码网WWW| 18禁免费无码无遮挡不卡网站| 全球中文成人在线| 无码任你躁久久久久久老妇| 国产成人精品无码播放| 午夜无码A级毛片免费视频| 亚洲精品无码不卡在线播HE| 欧洲精品无码一区二区三区在线播放| 中文字幕久久欲求不满| 精品久久久久久久久中文字幕| 少妇无码?V无码专区在线观看| 精品无码人妻一区二区三区品| 亚洲精品无码乱码成人| 亚洲综合无码精品一区二区三区 | 最近中文字幕2019视频1| 久クク成人精品中文字幕| 久久人妻无码中文字幕| 日韩中文字幕精品免费一区| 亚洲av无码成人精品国产| 亚洲精品无码专区2| 中文字幕AV影片在线手机播放| 日韩少妇无码喷潮系列一二三| 狠狠躁狠狠爱免费视频无码| 国产成人AV无码精品| 久久亚洲av无码精品浪潮| 亚洲精品无码AV中文字幕电影网站| 综合国产在线观看无码| 中文亚洲AV片不卡在线观看| 色噜噜综合亚洲av中文无码 |